Concept for the design of a new stadium solution for a 23,000-seat stadium in Cagliari, Sardinia, to be built to a fixed and tight budget. Importantly, the project had prerequisites of a specific build time of 8 months from the moment entry on-site occurred, which was implemented into the design process via the use of lightweight steel solutions, synchronising with the use of modular solutions.